Home > Exhibition > Content

The basic foundation of the 300 w small wind turbine is how to fight

Dec 07, 2018

When the 300 w small wind turbine is installed, the first thing to do is to lay the foundation. For the 300 w small wind turbine, the square pit of 500 mm long, 500 mm wide and 500 mm deep can be excavated in the center of the site. With this as the center, the square pits of the required size of the equipment are excavated at A, B, C, and D at a distance of 5000 mm. The diagonal lines of A-C and B-D intersect perpendicularly to the center of the square pit.

 

Then screw each of the four ground anchors to the bottom, then screw another nut through the base, and align with the pin hole axis aligned with B, D or A, C, and the bottom plate is 40-50mm above the ground. The base is filled with concrete and finally the level of the base is adjusted.

 

Then hold the top of the anchoring anchor and place the ground anchor obliquely along the outer side of the square hole into the bottom of the pit. Place a stone block at the bottom of the pit to press the ground anchor, then pour the concrete, then place the stone, then pour the concrete, and alternately run until Fill in the square pit, and finally the anchor ring tends to the center of the field and is at an angle of 60° to the horizontal.

 

Finally, the ground anchor is hand-held, and concrete is poured into the pit to the top ring, and the entire ring is exposed to the ground. Note that the curing period of concrete is generally 100 hours. Do not install 300 w small wind turbines during the curing period to ensure that the quality of the foundation can meet the standard.www.titanwindturbine.com